Stc 6851; S 1st E over Sand Creek
FairBonneville County, Idaho · 1.5 N. Taylorville · Structure no. 000000000021135
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected November 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 980
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stc 6851; S 1st E over Sand Creek is a prestressed concrete tee beam carrying Stc 6851; S 1st E over Sand Creek in Bonneville County, Idaho. It was built in 1962, so it is 63 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 980 vehicles a day, roughly 9% of them trucks, projected to reach 1,470 by 2042. The structure is 42 ft (12.8 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stc 6851; S 1st E over Sand Creek built?
It was built in 1962, making it 63 years old in 2025.
What condition is Stc 6851; S 1st E over Sand Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Stc 6851; S 1st E over Sand Creek carry?
About 980 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is Stc 6851; S 1st E over Sand Creek?
The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 30 ft wide.
Who owns Stc 6851; S 1st E over Sand Creek?
It is owned by the County Highway Agency.