US Bridges

SH 200 over Pack River

Fair

Bonner County, Idaho · 7.1 E. Ponderay · Structure no. 000000000019035

Built
1978
47 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
183 ft
3 main spans
Daily traffic
4,000
2023 count
Owner
State
State Highway Agency

About this bridge

SH 200 over Pack River is a prestressed concrete stringer/multi-beam or girder carrying SH 200 over Pack River in Bonner County, Idaho. It was built in 1978, so it is 47 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,000 vehicles a day, roughly 12% of them trucks, projected to reach 6,000 by 2042. The structure is 183 ft (55.8 m) long and 46 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSH 200
CrossesPack River
Location7.1 E. Ponderay
RouteState Highway 200
StateIdaho
Coordinates48.32383, -116.38542
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating35.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length183 ft (55.8 m)
Longest span60 ft (18.4 m)
Deck width46 ft (13.9 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2023)
Projected traffic6,000 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 200 over Pack River built?

It was built in 1978, making it 47 years old in 2025.

What condition is SH 200 over Pack River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does SH 200 over Pack River carry?

About 4,000 vehicles per day (2023 count), of which roughly 12% are trucks.

How long is SH 200 over Pack River?

The structure is 183 ft (55.8 m) long with a longest span of 60 ft (18.4 m) and a deck 46 ft wide.

Who owns SH 200 over Pack River?

It is owned by the State Highway Agency.