North Picabo Road over Silver Creek;n.Picabo B
FairPosted for loadBlaine County, Idaho · 0.6 N. Picabo · Structure no. 000000000023770
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 2 main spans
- Daily traffic
- 140
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
North Picabo Road over Silver Creek;n.Picabo B is a steel stringer/multi-beam or girder carrying North Picabo Road over Silver Creek;n.Picabo B in Blaine County, Idaho. It was built in 1989, so it is 36 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 140 vehicles a day, roughly 17% of them trucks, projected to reach 210 by 2042. The structure is 45 ft (13.7 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Picabo Road over Silver Creek;n.Picabo B built?
It was built in 1989, making it 36 years old in 2025.
What condition is North Picabo Road over Silver Creek;n.Picabo B in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does North Picabo Road over Silver Creek;n.Picabo B carry?
About 140 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is North Picabo Road over Silver Creek;n.Picabo B?
The structure is 45 ft (13.7 m) long with a longest span of 22 ft (6.7 m) and a deck 23 ft wide.
Who owns North Picabo Road over Silver Creek;n.Picabo B?
It is owned by the County Highway Agency.