Second Avenue over Trail Creek
FairBlaine County, Idaho · 0.4 S. 0.1 E. Ketchum · Structure no. 000000000023666
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected November 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 500
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Second Avenue over Trail Creek is a prestressed concrete tee beam carrying Second Avenue over Trail Creek in Blaine County, Idaho. It was built in 1995, so it is 30 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 750 by 2039. The structure is 50 ft (15.2 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second Avenue over Trail Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is Second Avenue over Trail Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Second Avenue over Trail Creek carry?
About 500 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Second Avenue over Trail Creek?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 42 ft wide.
Who owns Second Avenue over Trail Creek?
It is owned by the City or Municipal Highway Agency and maintained by the Private (other than railroad).