Silverweed Way RD over Trail Creek
FairBlaine County, Idaho · In Sun Valley · Structure no. 000000000033310
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected August 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 100
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Silverweed Way RD over Trail Creek is a prestressed concrete tee beam carrying Silverweed Way RD over Trail Creek in Blaine County, Idaho. It was built in 1965, so it is 60 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 150 by 2039. The structure is 36 ft (11 m) long and 18 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Silverweed Way RD over Trail Creek built?
It was built in 1965, making it 60 years old in 2025.
What condition is Silverweed Way RD over Trail Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Silverweed Way RD over Trail Creek carry?
About 100 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Silverweed Way RD over Trail Creek?
The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 18 ft wide.
Who owns Silverweed Way RD over Trail Creek?
It is owned by the City or Municipal Highway Agency.