US Bridges

Weeding Lane over Reservation Canal

Fair

Bingham County, Idaho · 4.0 S. Firth · Structure no. 000000000022710

Built
1985
40 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
40 ft
1 main span
Daily traffic
220
2023 count
Owner
County
County Highway Agency

About this bridge

Weeding Lane over Reservation Canal is a steel stringer/multi-beam or girder carrying Weeding Lane over Reservation Canal in Bingham County, Idaho. It was built in 1985, so it is 40 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 220 vehicles a day, roughly 10% of them trucks, projected to reach 330 by 2042. The structure is 40 ft (12.2 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWeeding Lane
CrossesReservation Canal
Location4.0 S. Firth
RouteCounty Highway 0
StateIdaho
Coordinates43.24583, -112.18597
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating69 US tons
Inventory rating41 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width34 ft (10.4 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2023)
Projected traffic330 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Weeding Lane over Reservation Canal built?

It was built in 1985, making it 40 years old in 2025.

What condition is Weeding Lane over Reservation Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Weeding Lane over Reservation Canal carry?

About 220 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Weeding Lane over Reservation Canal?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 34 ft wide.

Who owns Weeding Lane over Reservation Canal?

It is owned by the County Highway Agency.