Weeding Lane over Reservation Canal
FairBingham County, Idaho · 4.0 S. Firth · Structure no. 000000000022710
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 220
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Weeding Lane over Reservation Canal is a steel stringer/multi-beam or girder carrying Weeding Lane over Reservation Canal in Bingham County, Idaho. It was built in 1985, so it is 40 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 220 vehicles a day, roughly 10% of them trucks, projected to reach 330 by 2042. The structure is 40 ft (12.2 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Weeding Lane over Reservation Canal built?
It was built in 1985, making it 40 years old in 2025.
What condition is Weeding Lane over Reservation Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Weeding Lane over Reservation Canal carry?
About 220 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Weeding Lane over Reservation Canal?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 34 ft wide.
Who owns Weeding Lane over Reservation Canal?
It is owned by the County Highway Agency.