US 30 over UPRR & Canal; Topaz Op
FairBannock County, Idaho · 5.8 W. Lava Hot Springs · Structure no. 000000000013706
- Built
- 2011
- 14 years old
- Condition
- Fair
- inspected October 2021
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 613 ft
- 3 main spans
- Daily traffic
- 5,700
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 30 over UPRR & Canal; Topaz Op is a steel continuous stringer/multi-beam or girder carrying US 30 over UPRR & Canal; Topaz Op in Bannock County, Idaho. It was built in 2011, so it is 14 years old, younger than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,700 vehicles a day, roughly 24% of them trucks, projected to reach 8,550 by 2042. The structure is 613 ft (186.8 m) long and 82 ft wide. If it were closed, the detour would be 42.3 mi (68 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 30 over UPRR & Canal; Topaz Op built?
It was built in 2011, making it 14 years old in 2025.
What condition is US 30 over UPRR & Canal; Topaz Op in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2021.
How much traffic does US 30 over UPRR & Canal; Topaz Op carry?
About 5,700 vehicles per day (2023 count), of which roughly 24% are trucks.
How long is US 30 over UPRR & Canal; Topaz Op?
The structure is 613 ft (186.8 m) long with a longest span of 320 ft (97.5 m) and a deck 82 ft wide.
Who owns US 30 over UPRR & Canal; Topaz Op?
It is owned by the State Highway Agency.