US Bridges

STC3024;POLLARD LN over Middleton Canal

FairPosted for load

Ada County, Idaho · 0.6 N. 1.3 E. Star · Structure no. 000000000026315

Built
1967
58 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
25 ft
1 main span
Daily traffic
1,300
2023 count
Owner
County
County Highway Agency

About this bridge

STC3024;POLLARD LN over Middleton Canal is a steel stringer/multi-beam or girder carrying STC3024;POLLARD LN over Middleton Canal in Ada County, Idaho. It was built in 1967, so it is 58 years old, older than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 1,300 vehicles a day, projected to reach 1,950 by 2042. The structure is 25 ft (7.6 m) long and 22 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesSTC3024;POLLARD LN
CrossesMiddleton Canal
Location0.6 N. 1.3 E. Star
RouteCounty Highway 3024
StateIdaho
Coordinates43.70006, -116.46829
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating24 US tons
Inventory rating14 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadH 10
Structure length25 ft (7.6 m)
Longest span24 ft (7.3 m)
Deck width22 ft (6.6 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2023)
Projected traffic1,950 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$312,000 (2019 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was STC3024;POLLARD LN over Middleton Canal built?

It was built in 1967, making it 58 years old in 2025.

What condition is STC3024;POLLARD LN over Middleton Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does STC3024;POLLARD LN over Middleton Canal carry?

About 1,300 vehicles per day (2023 count).

How long is STC3024;POLLARD LN over Middleton Canal?

The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 22 ft wide.

Who owns STC3024;POLLARD LN over Middleton Canal?

It is owned by the County Highway Agency.