US Bridges

SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs

Good

Ada County, Idaho · 6.5 W. Boise · Structure no. 000000000021186

Built
2019
6 years old
Condition
Good
inspected September 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
194 ft
2 main spans
Daily traffic
19,500
2023 count
Owner
State
State Highway Agency

About this bridge

SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs is a prestressed concrete stringer/multi-beam or girder carrying SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs in Ada County, Idaho. It was built in 2019, so it is 6 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,500 vehicles a day, roughly 2% of them trucks, projected to reach 29,250 by 2042. The structure is 194 ft (59.1 m) long and 77 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSMA7013;CLOVERDALE
CrossesI 84;CLOVERDALE RD Gs
Location6.5 W. Boise
RouteCounty Highway 7013
StateIdaho
Coordinates43.597, -116.33437
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.3 US tons
Inventory rating59 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length194 ft (59.1 m)
Longest span95 ft (28.9 m)
Deck width77 ft (23.5 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,500 (2023)
Projected traffic29,250 by 2042
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs built?

It was built in 2019, making it 6 years old in 2025.

What condition is SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.

How much traffic does SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs carry?

About 19,500 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs?

The structure is 194 ft (59.1 m) long with a longest span of 95 ft (28.9 m) and a deck 77 ft wide.

Who owns SMA7013;CLOVERDALE over I 84;CLOVERDALE RD Gs?

It is owned by the State Highway Agency.