US Bridges

SH 21 over Boise River

Good

Ada County, Idaho · Near Diversion Dam · Structure no. 000000000015769

Built
1996
29 years old
Condition
Good
inspected January 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
1,495 ft
9 main spans
Daily traffic
6,800
2023 count
Owner
State
State Highway Agency

About this bridge

SH 21 over Boise River is a steel stringer/multi-beam or girder carrying SH 21 over Boise River in Ada County, Idaho. It was built in 1996, so it is 29 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,800 vehicles a day, roughly 11% of them trucks, projected to reach 10,200 by 2042. The structure is 1,495 ft (455.7 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSH 21
CrossesBoise River
LocationNear Diversion Dam
RouteState Highway 21
StateIdaho
Coordinates43.54359, -116.10214
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating54 US tons
Inventory rating32 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans9
Design loadHS 25 or greater
Structure length1,495 ft (455.7 m)
Longest span185 ft (56.4 m)
Deck width42 ft (12.7 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,800 (2023)
Projected traffic10,200 by 2042
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 21 over Boise River built?

It was built in 1996, making it 29 years old in 2025.

What condition is SH 21 over Boise River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does SH 21 over Boise River carry?

About 6,800 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is SH 21 over Boise River?

The structure is 1,495 ft (455.7 m) long with a longest span of 185 ft (56.4 m) and a deck 42 ft wide.

Who owns SH 21 over Boise River?

It is owned by the State Highway Agency.