SH 55 over Dry Creek

Fair

Ada County, Idaho · 8.1 NW Boise Wcl · Structure no. 000000000014756

Built
1997
28 years old
Condition
Fair
inspected November 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
63 ft
1 main span
Daily traffic
13,500
2023 count
Owner
State
State Highway Agency

About this bridge

SH 55 over Dry Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 55 over Dry Creek in Ada County, Idaho. It was built in 1997, so it is 28 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,500 vehicles a day, roughly 6% of them trucks, projected to reach 20,250 by 2042. The structure is 63 ft (19.2 m) long and 87 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSH 55
CrossesDry Creek
Location8.1 NW Boise Wcl
RouteState Highway 55
StateIdaho
Coordinates43.73236, -116.30414
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length63 ft (19.2 m)
Longest span59 ft (18 m)
Deck width87 ft (26.5 m)
Roadway width84 ft (25.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,500 (2023)
Projected traffic20,250 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 55 over Dry Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is SH 55 over Dry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2021.

How much traffic does SH 55 over Dry Creek carry?

About 13,500 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is SH 55 over Dry Creek?

The structure is 63 ft (19.2 m) long with a longest span of 59 ft (18 m) and a deck 87 ft wide.

Who owns SH 55 over Dry Creek?

It is owned by the State Highway Agency.