US Bridges

US 20 Wbl & Ebl over Boise River

Fair

Ada County, Idaho · In Boise;boise Connector · Structure no. 000000000012263

Built
1990
35 years old
Condition
Fair
inspected February 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
597 ft
4 main spans
Daily traffic
37,500
2023 count
Owner
State
State Highway Agency

About this bridge

US 20 Wbl & Ebl over Boise River is a prestressed concrete continuous box beam or girders - multiple carrying US 20 Wbl & Ebl over Boise River in Ada County, Idaho. It was built in 1990, so it is 35 years old, younger than the Idaho average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 37,500 vehicles a day, roughly 4% of them trucks, projected to reach 56,250 by 2042. The structure is 597 ft (182 m) long and 123 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS 20 Wbl & Ebl
CrossesBoise River
LocationIn Boise;boise Connector
RouteU.S. Route 20
StateIdaho
Coordinates43.61839, -116.229
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length597 ft (182 m)
Longest span162 ft (49.4 m)
Deck width123 ft (37.5 m)
Roadway width117 ft (35.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,500 (2023)
Projected traffic56,250 by 2042
Trucks4%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 20 Wbl & Ebl over Boise River built?

It was built in 1990, making it 35 years old in 2025.

What condition is US 20 Wbl & Ebl over Boise River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2021.

How much traffic does US 20 Wbl & Ebl over Boise River carry?

About 37,500 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is US 20 Wbl & Ebl over Boise River?

The structure is 597 ft (182 m) long with a longest span of 162 ft (49.4 m) and a deck 123 ft wide.

Who owns US 20 Wbl & Ebl over Boise River?

It is owned by the State Highway Agency.