Stp 7343;MAIN ST over Boise River Slough
GoodAda County, Idaho · In Boise;main St.Wbl · Structure no. 000000000012770
- Built
- 1965
- 60 years old, rebuilt 1991
- Condition
- Good
- inspected February 2022
- Type
- Frame
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 13,500
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Stp 7343;MAIN ST over Boise River Slough is a concrete frame carrying Stp 7343;MAIN ST over Boise River Slough in Ada County, Idaho. It was built in 1965 and reconstructed in 1991, so it is 60 years old, older than the Idaho average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,500 vehicles a day, roughly 5% of them trucks, projected to reach 20,250 by 2042. The structure is 26 ft (7.9 m) long and 160 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stp 7343;MAIN ST over Boise River Slough built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1991.
What condition is Stp 7343;MAIN ST over Boise River Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.
How much traffic does Stp 7343;MAIN ST over Boise River Slough carry?
About 13,500 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Stp 7343;MAIN ST over Boise River Slough?
The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 160 ft wide.
Who owns Stp 7343;MAIN ST over Boise River Slough?
It is owned by the County Highway Agency.