Ia 141 over I-29
PoorPosted for loadWoodbury County, Iowa · At the Jct. of I-29 · Structure no. 000000000053230
- Built
- 1959
- 66 years old
- Condition
- Poor
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 210 ft
- 4 main spans
- Daily traffic
- 2,980
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Ia 141 over I-29 is a prestressed concrete stringer/multi-beam or girder carrying Ia 141 over I-29 in Woodbury County, Iowa. It was built in 1959, so it is 66 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for other load-capacity restriction.
It carries about 2,980 vehicles a day, roughly 11% of them trucks, projected to reach 2,980 by 2044. The structure is 210 ft (64 m) long and 36 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ia 141 over I-29 built?
It was built in 1959, making it 66 years old in 2025.
What condition is Ia 141 over I-29 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Ia 141 over I-29 carry?
About 2,980 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is Ia 141 over I-29?
The structure is 210 ft (64 m) long with a longest span of 65 ft (19.8 m) and a deck 36 ft wide.
Who owns Ia 141 over I-29?
It is owned by the State Highway Agency.