US Bridges

T58 80th ST over Walnut Creek

Good

Poweshiek County, Iowa · 081152002 · Structure no. 000000000294571

Built
2022
3 years old
Condition
Good
inspected December 2023
Type
Culvert
Concrete Continuous
Length
26 ft
2 main spans
Daily traffic
15
2022 count
Owner
County
County Highway Agency

About this bridge

T58 80th ST over Walnut Creek is a concrete continuous culvert carrying T58 80th ST over Walnut Creek in Poweshiek County, Iowa. It was built in 2022, so it is 3 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15 vehicles a day, projected to reach 15 by 2043. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT58 80th ST
CrossesWalnut Creek
Location081152002
RouteCounty Highway 0
StateIowa
Coordinates41.81804, -92.63006
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating61.1 US tons
Inventory rating47.2 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2022)
Projected traffic15 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was T58 80th ST over Walnut Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is T58 80th ST over Walnut Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does T58 80th ST over Walnut Creek carry?

About 15 vehicles per day (2022 count).

How long is T58 80th ST over Walnut Creek?

The structure is 26 ft (7.9 m) long with a longest span of 12 ft (3.7 m).

Who owns T58 80th ST over Walnut Creek?

It is owned by the County Highway Agency.