US Bridges

200th ST over Drainage

PoorPosted for load

Plymouth County, Iowa · 092492603 · Structure no. 000000000275940

Built
1959
66 years old
Condition
Poor
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

200th ST over Drainage is a steel stringer/multi-beam or girder carrying 200th ST over Drainage in Plymouth County, Iowa. It was built in 1959, so it is 66 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 30 vehicles a day, projected to reach 30 by 2043. The structure is 30 ft (9.1 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries200th ST
CrossesDrainage
Location092492603
RouteCounty Highway 0
StateIowa
Coordinates42.76496, -96.59146
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.8 US tons
Inventory rating16.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width22 ft (6.7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic30 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$195,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 200th ST over Drainage built?

It was built in 1959, making it 66 years old in 2025.

What condition is 200th ST over Drainage in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2023.

How much traffic does 200th ST over Drainage carry?

About 30 vehicles per day (2022 count).

How long is 200th ST over Drainage?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 22 ft wide.

Who owns 200th ST over Drainage?

It is owned by the County Highway Agency.