So. 6th St. over Linn Creek
FairMarshall County, Iowa · 083183400 · Structure no. 000000000503805
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 245 ft
- 3 main spans
- Daily traffic
- 11,300
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
So. 6th St. over Linn Creek is a prestressed concrete stringer/multi-beam or girder carrying So. 6th St. over Linn Creek in Marshall County, Iowa. It was built in 1984, so it is 41 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,300 vehicles a day, roughly 2% of them trucks, projected to reach 11,300 by 2043. The structure is 245 ft (74.7 m) long and 69 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was So. 6th St. over Linn Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is So. 6th St. over Linn Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does So. 6th St. over Linn Creek carry?
About 11,300 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is So. 6th St. over Linn Creek?
The structure is 245 ft (74.7 m) long with a longest span of 82 ft (25 m) and a deck 69 ft wide.
Who owns So. 6th St. over Linn Creek?
It is owned by the City or Municipal Highway Agency.