US Bridges

G62 Pierce DR over Walnut Creek

Good

Marion County, Iowa · 075182803 · Structure no. 000000000239751

Built
2021
4 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete Continuous
Length
110 ft
3 main spans
Daily traffic
70
2022 count
Owner
County
County Highway Agency

About this bridge

G62 Pierce DR over Walnut Creek is a concrete continuous slab carrying G62 Pierce DR over Walnut Creek in Marion County, Iowa. It was built in 2021, so it is 4 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 70 vehicles a day, projected to reach 70 by 2044. The structure is 110 ft (33.5 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesG62 Pierce DR
CrossesWalnut Creek
Location075182803
RouteCounty Highway 0
StateIowa
Coordinates41.26945, -92.94252
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating40 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length110 ft (33.5 m)
Longest span43 ft (13.1 m)
Deck width27 ft (8.3 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2022)
Projected traffic70 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was G62 Pierce DR over Walnut Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is G62 Pierce DR over Walnut Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does G62 Pierce DR over Walnut Creek carry?

About 70 vehicles per day (2022 count).

How long is G62 Pierce DR over Walnut Creek?

The structure is 110 ft (33.5 m) long with a longest span of 43 ft (13.1 m) and a deck 27 ft wide.

Who owns G62 Pierce DR over Walnut Creek?

It is owned by the County Highway Agency.