US Bridges

K60 Indian Ave over Tom Creek

Good

Lyon County, Iowa · 100443002 · Structure no. 000000000230981

Built
2022
3 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete Continuous
Length
210 ft
4 main spans
Daily traffic
279
2022 count
Owner
County
County Highway Agency

About this bridge

K60 Indian Ave over Tom Creek is a concrete continuous slab carrying K60 Indian Ave over Tom Creek in Lyon County, Iowa. It was built in 2022, so it is 3 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 279 vehicles a day, roughly 22% of them trucks, projected to reach 279 by 2043. The structure is 210 ft (64 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesK60 Indian Ave
CrossesTom Creek
Location100443002
RouteCounty Highway 0
StateIowa
Coordinates43.45472, -96.09612
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length210 ft (64 m)
Longest span59 ft (18 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic279 (2022)
Projected traffic279 by 2043
Trucks22%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$30,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was K60 Indian Ave over Tom Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is K60 Indian Ave over Tom Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does K60 Indian Ave over Tom Creek carry?

About 279 vehicles per day (2022 count), of which roughly 22% are trucks.

How long is K60 Indian Ave over Tom Creek?

The structure is 210 ft (64 m) long with a longest span of 59 ft (18 m) and a deck 33 ft wide.

Who owns K60 Indian Ave over Tom Creek?

It is owned by the County Highway Agency.