US Bridges

Shaver RD NE over Mccloud Run

Good

Linn County, Iowa · 083071600 · Structure no. 000000000501021

Built
2023
2 years old
Condition
Good
inspected April 2023
Type
Slab
Concrete Continuous
Length
189 ft
3 main spans
Daily traffic
2,450
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Shaver RD NE over Mccloud Run is a concrete continuous slab carrying Shaver RD NE over Mccloud Run in Linn County, Iowa. It was built in 2023, so it is 2 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,450 vehicles a day, projected to reach 2,450 by 2043. The structure is 189 ft (57.6 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesShaver RD NE
CrossesMccloud Run
Location083071600
RouteCity Street 0
StateIowa
Coordinates41.99808, -91.67133
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length189 ft (57.6 m)
Longest span70 ft (21.3 m)
Deck width58 ft (17.8 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,450 (2021)
Projected traffic2,450 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Shaver RD NE over Mccloud Run built?

It was built in 2023, making it 2 years old in 2025.

What condition is Shaver RD NE over Mccloud Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Shaver RD NE over Mccloud Run carry?

About 2,450 vehicles per day (2021 count).

How long is Shaver RD NE over Mccloud Run?

The structure is 189 ft (57.6 m) long with a longest span of 70 ft (21.3 m) and a deck 58 ft wide.

Who owns Shaver RD NE over Mccloud Run?

It is owned by the City or Municipal Highway Agency.