Main ST E over Division Creek
FairJones County, Iowa · 000000000 · Structure no. 000000000000280
- Built
- 1900
- 125 years old
- Condition
- Fair
- inspected November 2024
- Type
- Arch - Deck
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 3,776
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Main ST E over Division Creek is a concrete arch - deck carrying Main ST E over Division Creek in Jones County, Iowa. It was built in 1900, so it is 125 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,776 vehicles a day, projected to reach 3,776 by 2044. The structure is 27 ft (8.2 m) long and 23 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST E over Division Creek built?
It was built in 1900, making it 125 years old in 2025.
What condition is Main ST E over Division Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Main ST E over Division Creek carry?
About 3,776 vehicles per day (2022 count).
How long is Main ST E over Division Creek?
The structure is 27 ft (8.2 m) long with a longest span of 27 ft (8.2 m) and a deck 23 ft wide.
Who owns Main ST E over Division Creek?
It is owned by the City or Municipal Highway Agency.