FM SW 540th Ave over Deer Creek
FairJohnson County, Iowa · 078082903 · Structure no. 000000000203800
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 68 ft
- 1 main span
- Daily traffic
- 900
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FM SW 540th Ave over Deer Creek is a prestressed concrete stringer/multi-beam or girder carrying FM SW 540th Ave over Deer Creek in Johnson County, Iowa. It was built in 1976, so it is 49 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 900 vehicles a day, roughly 17% of them trucks, projected to reach 900 by 2043. The structure is 68 ft (20.7 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM SW 540th Ave over Deer Creek built?
It was built in 1976, making it 49 years old in 2025.
What condition is FM SW 540th Ave over Deer Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does FM SW 540th Ave over Deer Creek carry?
About 900 vehicles per day (2021 count), of which roughly 17% are trucks.
How long is FM SW 540th Ave over Deer Creek?
The structure is 68 ft (20.7 m) long with a longest span of 68 ft (20.7 m) and a deck 31 ft wide.
Who owns FM SW 540th Ave over Deer Creek?
It is owned by the County Highway Agency.