US Bridges

Division ST over Beers Creek

Good

Jackson County, Iowa · 0.1 Mile N on E29 Off 64 · Structure no. 000000000008331

Built
2018
7 years old
Condition
Good
inspected November 2022
Type
Slab
Concrete Continuous
Length
131 ft
3 main spans
Daily traffic
629
2022 count
Owner
County
County Highway Agency

About this bridge

Division ST over Beers Creek is a concrete continuous slab carrying Division ST over Beers Creek in Jackson County, Iowa. It was built in 2018, so it is 7 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 629 vehicles a day, roughly 7% of them trucks, projected to reach 629 by 2043. The structure is 131 ft (39.8 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDivision ST
CrossesBeers Creek
Location0.1 Mile N on E29 Off 64
RouteCity Street 0
StateIowa
Coordinates42.07411, -90.87982
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating46.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length131 ft (39.8 m)
Longest span51 ft (15.5 m)
Deck width41 ft (12.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic629 (2022)
Projected traffic629 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Division ST over Beers Creek built?

It was built in 2018, making it 7 years old in 2025.

What condition is Division ST over Beers Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does Division ST over Beers Creek carry?

About 629 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Division ST over Beers Creek?

The structure is 131 ft (39.8 m) long with a longest span of 51 ft (15.5 m) and a deck 41 ft wide.

Who owns Division ST over Beers Creek?

It is owned by the County Highway Agency.