US Bridges

Poweshiek Iowa over North English River

Good

Iowa County, Iowa · 079121902 · Structure no. 000000000189851

Built
2019
6 years old
Condition
Good
inspected December 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
192 ft
3 main spans
Daily traffic
26
2022 count
Owner
County
County Highway Agency

About this bridge

Poweshiek Iowa over North English River is a prestressed concrete stringer/multi-beam or girder carrying Poweshiek Iowa over North English River in Iowa County, Iowa. It was built in 2019, so it is 6 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26 vehicles a day, projected to reach 26 by 2043. The structure is 192 ft (58.5 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPoweshiek Iowa
CrossesNorth English River
Location079121902
RouteCounty Highway 0
StateIowa
Coordinates41.63701, -92.29971
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length192 ft (58.5 m)
Longest span68 ft (20.7 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26 (2022)
Projected traffic26 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Poweshiek Iowa over North English River built?

It was built in 2019, making it 6 years old in 2025.

What condition is Poweshiek Iowa over North English River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.

How much traffic does Poweshiek Iowa over North English River carry?

About 26 vehicles per day (2022 count).

How long is Poweshiek Iowa over North English River?

The structure is 192 ft (58.5 m) long with a longest span of 68 ft (20.7 m) and a deck 33 ft wide.

Who owns Poweshiek Iowa over North English River?

It is owned by the County Highway Agency.