FM & Austin Ave over Monona-Harrison Ditch
GoodHarrison County, Iowa · 081451404 · Structure no. 000000000028031
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 217 ft
- 3 main spans
- Daily traffic
- 396
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
FM & Austin Ave over Monona-Harrison Ditch is a prestressed concrete stringer/multi-beam or girder carrying FM & Austin Ave over Monona-Harrison Ditch in Harrison County, Iowa. It was built in 2004, so it is 21 years old, younger than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 396 vehicles a day, roughly 33% of them trucks, projected to reach 396 by 2043. The structure is 217 ft (66.1 m) long and 33 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM & Austin Ave over Monona-Harrison Ditch built?
It was built in 2004, making it 21 years old in 2025.
What condition is FM & Austin Ave over Monona-Harrison Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does FM & Austin Ave over Monona-Harrison Ditch carry?
About 396 vehicles per day (2023 count), of which roughly 33% are trucks.
How long is FM & Austin Ave over Monona-Harrison Ditch?
The structure is 217 ft (66.1 m) long with a longest span of 76 ft (23.2 m) and a deck 33 ft wide.
Who owns FM & Austin Ave over Monona-Harrison Ditch?
It is owned by the County Highway Agency.