US Bridges

C13 Grant ST over Bailey Creek

Good

Franklin County, Iowa · 093200803 · Structure no. 000000000501211

Built
2017
8 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete Continuous
Length
150 ft
3 main spans
Daily traffic
919
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

C13 Grant ST over Bailey Creek is a concrete continuous slab carrying C13 Grant ST over Bailey Creek in Franklin County, Iowa. It was built in 2017, so it is 8 years old, younger than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 919 vehicles a day, projected to reach 919 by 2043. The structure is 150 ft (45.7 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesC13 Grant ST
CrossesBailey Creek
Location093200803
RouteCity Street 0
StateIowa
Coordinates42.89138, -93.23084
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length150 ft (45.7 m)
Longest span59 ft (18 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic919 (2022)
Projected traffic919 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C13 Grant ST over Bailey Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is C13 Grant ST over Bailey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does C13 Grant ST over Bailey Creek carry?

About 919 vehicles per day (2022 count).

How long is C13 Grant ST over Bailey Creek?

The structure is 150 ft (45.7 m) long with a longest span of 59 ft (18 m) and a deck 33 ft wide.

Who owns C13 Grant ST over Bailey Creek?

It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.