US Bridges

Granite Rd. over Nutting Creek

PoorPosted for load

Fayette County, Iowa · 095081208 · Structure no. 000000000152950

Built
1909
116 years old
Condition
Poor
inspected October 2023
Type
Culvert
Concrete
Length
50 ft
1 main span
Daily traffic
44
2022 count
Owner
County
County Highway Agency

About this bridge

Granite Rd. over Nutting Creek is a concrete culvert carrying Granite Rd. over Nutting Creek in Fayette County, Iowa. It was built in 1909, so it is 116 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 44 vehicles a day, projected to reach 44 by 2043. The structure is 50 ft (15.2 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesGranite Rd.
CrossesNutting Creek
Location095081208
RouteCounty Highway 0
StateIowa
Coordinates43.0532, -91.73659
Functional classRural Minor Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating48.6 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width18 ft (5.5 m)
Roadway width16 ft (4.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44 (2022)
Projected traffic44 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$135,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Granite Rd. over Nutting Creek built?

It was built in 1909, making it 116 years old in 2025.

What condition is Granite Rd. over Nutting Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.

How much traffic does Granite Rd. over Nutting Creek carry?

About 44 vehicles per day (2022 count).

How long is Granite Rd. over Nutting Creek?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 18 ft wide.

Who owns Granite Rd. over Nutting Creek?

It is owned by the County Highway Agency.