210th Avenue over Drainage Ditch 5
FairClinton County, Iowa · 080E20104 · Structure no. 000000000121530
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected January 2025
- Type
- Slab
- Concrete Continuous
- Length
- 100 ft
- 3 main spans
- Daily traffic
- 750
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
210th Avenue over Drainage Ditch 5 is a concrete continuous slab carrying 210th Avenue over Drainage Ditch 5 in Clinton County, Iowa. It was built in 1965, so it is 60 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 750 vehicles a day, roughly 14% of them trucks, projected to reach 750 by 2045. The structure is 100 ft (30.5 m) long and 30 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 210th Avenue over Drainage Ditch 5 built?
It was built in 1965, making it 60 years old in 2025.
What condition is 210th Avenue over Drainage Ditch 5 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does 210th Avenue over Drainage Ditch 5 carry?
About 750 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is 210th Avenue over Drainage Ditch 5?
The structure is 100 ft (30.5 m) long with a longest span of 39 ft (11.9 m) and a deck 30 ft wide.
Who owns 210th Avenue over Drainage Ditch 5?
It is owned by the County Highway Agency.