Ramp 78EB 1A over Halawa Strm Hic Struc #9
GoodHonolulu County, Hawaii · 0.02MI Se/Struct #3A · Structure no. 003000780400090
- Built
- 1974
- 51 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 127 ft
- 2 main spans
- Daily traffic
- 37,170
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp 78EB 1A over Halawa Strm Hic Struc #9 is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp 78EB 1A over Halawa Strm Hic Struc #9 in Honolulu County, Hawaii. It was built in 1974, so it is 51 years old, younger than the Hawaii average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 37,170 vehicles a day, projected to reach 44,528 by 2025. The structure is 127 ft (38.7 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp 78EB 1A over Halawa Strm Hic Struc #9 built?
It was built in 1974, making it 51 years old in 2025.
What condition is Ramp 78EB 1A over Halawa Strm Hic Struc #9 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Ramp 78EB 1A over Halawa Strm Hic Struc #9 carry?
About 37,170 vehicles per day (2007 count).
How long is Ramp 78EB 1A over Halawa Strm Hic Struc #9?
The structure is 127 ft (38.7 m) long with a longest span of 59 ft (18 m) and a deck 50 ft wide.
Who owns Ramp 78EB 1A over Halawa Strm Hic Struc #9?
It is owned by the State Highway Agency.