Bill Carruth Pkwy over Silver Comet Trail
GoodPaulding County, Georgia · 1.4 MI NW of Hiram · Structure no. 000000022350810
- Built
- 2001
- 24 years old, rebuilt 2015
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 204 ft
- 3 main spans
- Daily traffic
- 18,600
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Bill Carruth Pkwy over Silver Comet Trail is a prestressed concrete stringer/multi-beam or girder carrying Bill Carruth Pkwy over Silver Comet Trail in Paulding County, Georgia. It was built in 2001 and reconstructed in 2015, so it is 24 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 18,600 vehicles a day, roughly 6% of them trucks, projected to reach 21,435 by 2031. The structure is 204 ft (62.2 m) long and 86 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bill Carruth Pkwy over Silver Comet Trail built?
It was built in 2001, making it 24 years old in 2025. It was reconstructed in 2015.
What condition is Bill Carruth Pkwy over Silver Comet Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Bill Carruth Pkwy over Silver Comet Trail carry?
About 18,600 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is Bill Carruth Pkwy over Silver Comet Trail?
The structure is 204 ft (62.2 m) long with a longest span of 76 ft (23.2 m) and a deck 86 ft wide.
Who owns Bill Carruth Pkwy over Silver Comet Trail?
It is owned by the County Highway Agency.