US Bridges

US 278 (ebl) over NS Railroad

Good

Paulding County, Georgia · 2.25 MI SE of Dallas · Structure no. 000000022300320

Built
1989
36 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
171 ft
3 main spans
Daily traffic
40,600
2024 count
Owner
State
State Highway Agency

About this bridge

US 278 (ebl) over NS Railroad is a prestressed concrete stringer/multi-beam or girder carrying US 278 (ebl) over NS Railroad in Paulding County, Georgia. It was built in 1989, so it is 36 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40,600 vehicles a day, roughly 1% of them trucks, projected to reach 48,240 by 2031. The structure is 171 ft (52.1 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 278 (ebl)
CrossesNS Railroad
Location2.25 MI SE of Dallas
RouteU.S. Route 278
StateGeorgia
Coordinates33.90202, -84.80438
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length171 ft (52.1 m)
Longest span57 ft (17.4 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40,600 (2024)
Projected traffic48,240 by 2031
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 278 (ebl) over NS Railroad built?

It was built in 1989, making it 36 years old in 2025.

What condition is US 278 (ebl) over NS Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does US 278 (ebl) over NS Railroad carry?

About 40,600 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is US 278 (ebl) over NS Railroad?

The structure is 171 ft (52.1 m) long with a longest span of 57 ft (17.4 m) and a deck 41 ft wide.

Who owns US 278 (ebl) over NS Railroad?

It is owned by the State Highway Agency.