US Bridges

Belville Road over I - 75 (exit 2)

Good

Lowndes County, Georgia · 3.5 MI S of Lake Park · Structure no. 000000018550960

Built
2021
4 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Concrete Continuous
Length
270 ft
2 main spans
Daily traffic
1,750
2024 count
Owner
State
State Highway Agency

About this bridge

Belville Road over I - 75 (exit 2) is a concrete continuous stringer/multi-beam or girder carrying Belville Road over I - 75 (exit 2) in Lowndes County, Georgia. It was built in 2021, so it is 4 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,750 vehicles a day, roughly 1% of them trucks, projected to reach 3,585 by 2032. The structure is 270 ft (82.3 m) long and 59 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesBelville Road
CrossesI - 75 (exit 2)
Location3.5 MI S of Lake Park
RouteCounty Highway 274
StateGeorgia
Coordinates30.64361, -83.18916
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating92.9 US tons
Inventory rating37.9 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length270 ft (82.3 m)
Longest span135 ft (41.1 m)
Deck width59 ft (18.1 m)
Roadway width59 ft (18.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,750 (2024)
Projected traffic3,585 by 2032
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$36 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Belville Road over I - 75 (exit 2) built?

It was built in 2021, making it 4 years old in 2025.

What condition is Belville Road over I - 75 (exit 2) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Belville Road over I - 75 (exit 2) carry?

About 1,750 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Belville Road over I - 75 (exit 2)?

The structure is 270 ft (82.3 m) long with a longest span of 135 ft (41.1 m) and a deck 59 ft wide.

Who owns Belville Road over I - 75 (exit 2)?

It is owned by the State Highway Agency.