US Bridges

South Perry Pkwy over I-75@ 133.60 (exit 134)

Good

Houston County, Georgia · South Perry · Structure no. 000000015350310

Built
1999
26 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
331 ft
4 main spans
Daily traffic
2,000
2024 count
Owner
State
State Highway Agency

About this bridge

South Perry Pkwy over I-75@ 133.60 (exit 134) is a prestressed concrete stringer/multi-beam or girder carrying South Perry Pkwy over I-75@ 133.60 (exit 134) in Houston County, Georgia. It was built in 1999, so it is 26 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,845 by 2032. The structure is 331 ft (100.9 m) long and 116 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSouth Perry Pkwy
CrossesI-75@ 133.60 (exit 134)
LocationSouth Perry
RouteCity Street 835
StateGeorgia
Coordinates32.43159, -83.75695
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating48 US tons
Inventory rating29 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length331 ft (100.9 m)
Longest span102 ft (31.1 m)
Deck width116 ft (35.3 m)
Roadway width112 ft (34.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2024)
Projected traffic1,845 by 2032
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.5 million
NavigationNo navigation control on waterway

Frequently asked questions

When was South Perry Pkwy over I-75@ 133.60 (exit 134) built?

It was built in 1999, making it 26 years old in 2025.

What condition is South Perry Pkwy over I-75@ 133.60 (exit 134) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does South Perry Pkwy over I-75@ 133.60 (exit 134) carry?

About 2,000 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is South Perry Pkwy over I-75@ 133.60 (exit 134)?

The structure is 331 ft (100.9 m) long with a longest span of 102 ft (31.1 m) and a deck 116 ft wide.

Who owns South Perry Pkwy over I-75@ 133.60 (exit 134)?

It is owned by the State Highway Agency.