US Bridges

US 41- SR 127 over I-75 @134.61(EXIT 135)

Good

Houston County, Georgia · Perry - SW Section · Structure no. 000000015300060

Built
1963
62 years old, rebuilt 1989
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
204 ft
4 main spans
Daily traffic
13,200
2024 count
Owner
State
State Highway Agency

About this bridge

US 41- SR 127 over I-75 @134.61(EXIT 135) is a prestressed concrete stringer/multi-beam or girder carrying US 41- SR 127 over I-75 @134.61(EXIT 135) in Houston County, Georgia. It was built in 1963 and reconstructed in 1989, so it is 62 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,200 vehicles a day, roughly 8% of them trucks, projected to reach 15,300 by 2032. The structure is 204 ft (62.2 m) long and 95 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 41- SR 127
CrossesI-75 @134.61(EXIT 135)
LocationPerry - SW Section
RouteU.S. Route 41
StateGeorgia
Coordinates32.44678, -83.75459
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length204 ft (62.2 m)
Longest span70 ft (21.3 m)
Deck width95 ft (29 m)
Roadway width92 ft (28 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,200 (2024)
Projected traffic15,300 by 2032
Trucks8%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 41- SR 127 over I-75 @134.61(EXIT 135) built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1989.

What condition is US 41- SR 127 over I-75 @134.61(EXIT 135) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does US 41- SR 127 over I-75 @134.61(EXIT 135) carry?

About 13,200 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is US 41- SR 127 over I-75 @134.61(EXIT 135)?

The structure is 204 ft (62.2 m) long with a longest span of 70 ft (21.3 m) and a deck 95 ft wide.

Who owns US 41- SR 127 over I-75 @134.61(EXIT 135)?

It is owned by the State Highway Agency.