US Bridges

S.R. 11 Connector over I-75 (exit 138) @ 137.93

Good

Houston County, Georgia · 2 MI N of Perry · Structure no. 000000015300840

Built
1988
37 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
204 ft
4 main spans
Daily traffic
12,900
2024 count
Owner
State
State Highway Agency

About this bridge

S.R. 11 Connector over I-75 (exit 138) @ 137.93 is a prestressed concrete stringer/multi-beam or girder carrying S.R. 11 Connector over I-75 (exit 138) @ 137.93 in Houston County, Georgia. It was built in 1988, so it is 37 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,900 vehicles a day, roughly 1% of them trucks, projected to reach 12,375 by 2032. The structure is 204 ft (62.2 m) long and 63 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesS.R. 11 Connector
CrossesI-75 (exit 138) @ 137.93
Location2 MI N of Perry
RouteState Highway 11
StateGeorgia
Coordinates32.49324, -83.74264
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating45 US tons
Inventory rating26.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20 + Mod
Structure length204 ft (62.2 m)
Longest span70 ft (21.3 m)
Deck width63 ft (19.3 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,900 (2024)
Projected traffic12,375 by 2032
Trucks1%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was S.R. 11 Connector over I-75 (exit 138) @ 137.93 built?

It was built in 1988, making it 37 years old in 2025.

What condition is S.R. 11 Connector over I-75 (exit 138) @ 137.93 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does S.R. 11 Connector over I-75 (exit 138) @ 137.93 carry?

About 12,900 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is S.R. 11 Connector over I-75 (exit 138) @ 137.93?

The structure is 204 ft (62.2 m) long with a longest span of 70 ft (21.3 m) and a deck 63 ft wide.

Who owns S.R. 11 Connector over I-75 (exit 138) @ 137.93?

It is owned by the State Highway Agency.