Elachee Road over SR 419 (I-985 US 23)
GoodHall County, Georgia · In South Gainesville · Structure no. 000000013951190
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 254 ft
- 2 main spans
- Daily traffic
- 250
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Elachee Road over SR 419 (I-985 US 23) is a prestressed concrete stringer/multi-beam or girder carrying Elachee Road over SR 419 (I-985 US 23) in Hall County, Georgia. It was built in 2024, so it is 1 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 10% of them trucks, projected to reach 325 by 2044. The structure is 254 ft (77.4 m) long and 46 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Elachee Road over SR 419 (I-985 US 23) built?
It was built in 2024, making it 1 years old in 2025.
What condition is Elachee Road over SR 419 (I-985 US 23) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Elachee Road over SR 419 (I-985 US 23) carry?
About 250 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Elachee Road over SR 419 (I-985 US 23)?
The structure is 254 ft (77.4 m) long with a longest span of 127 ft (38.7 m) and a deck 46 ft wide.
Who owns Elachee Road over SR 419 (I-985 US 23)?
It is owned by the State Highway Agency.