Atlanta Highway over SR 419 (I-985 US 23)

Good

Hall County, Georgia · In Oak Wood · Structure no. 000000013950980

Built
2007
18 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
287 ft
4 main spans
Daily traffic
19,200
2024 count
Owner
State
State Highway Agency

About this bridge

Atlanta Highway over SR 419 (I-985 US 23) is a prestressed concrete stringer/multi-beam or girder carrying Atlanta Highway over SR 419 (I-985 US 23) in Hall County, Georgia. It was built in 2007, so it is 18 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,200 vehicles a day, roughly 1% of them trucks, projected to reach 29,040 by 2032. The structure is 287 ft (87.5 m) long and 93 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAtlanta Highway
CrossesSR 419 (I-985 US 23)
LocationIn Oak Wood
RouteState Highway 13
StateGeorgia
Coordinates34.23011, -83.8583
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating65.9 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length287 ft (87.5 m)
Longest span78 ft (23.8 m)
Deck width93 ft (28.3 m)
Roadway width79 ft (24 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,200 (2024)
Projected traffic29,040 by 2032
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Atlanta Highway over SR 419 (I-985 US 23) built?

It was built in 2007, making it 18 years old in 2025.

What condition is Atlanta Highway over SR 419 (I-985 US 23) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Atlanta Highway over SR 419 (I-985 US 23) carry?

About 19,200 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Atlanta Highway over SR 419 (I-985 US 23)?

The structure is 287 ft (87.5 m) long with a longest span of 78 ft (23.8 m) and a deck 93 ft wide.

Who owns Atlanta Highway over SR 419 (I-985 US 23)?

It is owned by the State Highway Agency.