US Bridges

US 19 over M-9250 Abernathy Road

Good

Fulton County, Georgia · 5.9 MI S of Roswell · Structure no. 000000012154280

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
173 ft
2 main spans
Daily traffic
165,000
2024 count
Owner
State
State Highway Agency

About this bridge

US 19 over M-9250 Abernathy Road is a concrete stringer/multi-beam or girder carrying US 19 over M-9250 Abernathy Road in Fulton County, Georgia. It was built in 2022, so it is 3 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 165,000 vehicles a day, roughly 3% of them trucks, projected to reach 178,900 by 2039. The structure is 173 ft (52.7 m) long and 119 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 19
CrossesM-9250 Abernathy Road
Location5.9 MI S of Roswell
RouteU.S. Route 19
StateGeorgia
Coordinates33.93331, -84.35782
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.9 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length173 ft (52.7 m)
Longest span92 ft (28 m)
Deck width119 ft (36.3 m)
Roadway width112 ft (34.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic165,000 (2024)
Projected traffic178,900 by 2039
Trucks3%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$23.1 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 19 over M-9250 Abernathy Road built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 19 over M-9250 Abernathy Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does US 19 over M-9250 Abernathy Road carry?

About 165,000 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is US 19 over M-9250 Abernathy Road?

The structure is 173 ft (52.7 m) long with a longest span of 92 ft (28 m) and a deck 119 ft wide.

Who owns US 19 over M-9250 Abernathy Road?

It is owned by the State Highway Agency.