US Bridges

US 19 over M-9250 Abernathy Road

Good

Fulton County, Georgia · 6.2 Miles S of Roswell · Structure no. 000000012154270

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
355 ft
4 main spans
Daily traffic
53,150
2024 count
Owner
State
State Highway Agency

About this bridge

US 19 over M-9250 Abernathy Road is a concrete stringer/multi-beam or girder carrying US 19 over M-9250 Abernathy Road in Fulton County, Georgia. It was built in 2022, so it is 3 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 53,150 vehicles a day, roughly 3% of them trucks, projected to reach 72,490 by 2039. The structure is 355 ft (108.2 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 19
CrossesM-9250 Abernathy Road
Location6.2 Miles S of Roswell
RouteU.S. Route 19
StateGeorgia
Coordinates33.92586, -84.35738
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.9 US tons
Inventory rating46 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length355 ft (108.2 m)
Longest span104 ft (31.7 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic53,150 (2024)
Projected traffic72,490 by 2039
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$47.3 million (2022 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 19 over M-9250 Abernathy Road built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 19 over M-9250 Abernathy Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does US 19 over M-9250 Abernathy Road carry?

About 53,150 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is US 19 over M-9250 Abernathy Road?

The structure is 355 ft (108.2 m) long with a longest span of 104 ft (31.7 m) and a deck 39 ft wide.

Who owns US 19 over M-9250 Abernathy Road?

It is owned by the State Highway Agency.