US Bridges

400NB to 285EB over Ptree Dunwoody RD

Good

Fulton County, Georgia · In S. Sandy Springs · Structure no. 000000012154050

Built
2021
4 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
337 ft
3 main spans
Daily traffic
13,860
2024 count
Owner
State
State Highway Agency

About this bridge

400NB to 285EB over Ptree Dunwoody RD is a prestressed concrete stringer/multi-beam or girder carrying 400NB to 285EB over Ptree Dunwoody RD in Fulton County, Georgia. It was built in 2021, so it is 4 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 13,860 vehicles a day, roughly 3% of them trucks, projected to reach 16,750 by 2039. The structure is 337 ft (102.7 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries400NB to 285EB
CrossesPtree Dunwoody RD
LocationIn S. Sandy Springs
RouteInterstate 285
StateGeorgia
Coordinates33.91281, -84.35267
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating48.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length337 ft (102.7 m)
Longest span126 ft (38.5 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,860 (2024)
Projected traffic16,750 by 2039
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 400NB to 285EB over Ptree Dunwoody RD built?

It was built in 2021, making it 4 years old in 2025.

What condition is 400NB to 285EB over Ptree Dunwoody RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does 400NB to 285EB over Ptree Dunwoody RD carry?

About 13,860 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is 400NB to 285EB over Ptree Dunwoody RD?

The structure is 337 ft (102.7 m) long with a longest span of 126 ft (38.5 m) and a deck 33 ft wide.

Who owns 400NB to 285EB over Ptree Dunwoody RD?

It is owned by the State Highway Agency.