US Bridges

Courtland Street over I-75

Good

Fulton County, Georgia · In Atlanta · Structure no. 000000012106640

Built
1987
38 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
338 ft
2 main spans
Daily traffic
6,150
2024 count
Owner
State
State Highway Agency

About this bridge

Courtland Street over I-75 is a prestressed concrete stringer/multi-beam or girder carrying Courtland Street over I-75 in Fulton County, Georgia. It was built in 1987, so it is 38 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,150 vehicles a day, roughly 1% of them trucks, projected to reach 17,670 by 2032. The structure is 338 ft (103 m) long and 285 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCourtland Street
CrossesI-75
LocationIn Atlanta
RouteCity Street 9007
StateGeorgia
Coordinates33.76425, -84.38413
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating35.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length338 ft (103 m)
Longest span169 ft (51.5 m)
Deck width285 ft (86.9 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,150 (2024)
Projected traffic17,670 by 2032
Trucks1%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Courtland Street over I-75 built?

It was built in 1987, making it 38 years old in 2025.

What condition is Courtland Street over I-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Courtland Street over I-75 carry?

About 6,150 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Courtland Street over I-75?

The structure is 338 ft (103 m) long with a longest span of 169 ft (51.5 m) and a deck 285 ft wide.

Who owns Courtland Street over I-75?

It is owned by the State Highway Agency.