US Bridges

US 82/SR 520 (ebl) over N Westover Blvd

Good

Dougherty County, Georgia · Albany- Northwest Section · Structure no. 000000009550230

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
126 ft
1 main span
Daily traffic
9,530
2024 count
Owner
State
State Highway Agency

About this bridge

US 82/SR 520 (ebl) over N Westover Blvd is a prestressed concrete stringer/multi-beam or girder carrying US 82/SR 520 (ebl) over N Westover Blvd in Dougherty County, Georgia. It was built in 2024, so it is 1 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,530 vehicles a day, roughly 7% of them trucks, projected to reach 50,775 by 2032. The structure is 126 ft (38.4 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUS 82/SR 520 (ebl)
CrossesN Westover Blvd
LocationAlbany- Northwest Section
RouteU.S. Route 82
StateGeorgia
Coordinates31.62134, -84.21861
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating46 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length126 ft (38.4 m)
Longest span126 ft (38.4 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,530 (2024)
Projected traffic50,775 by 2032
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$16.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 82/SR 520 (ebl) over N Westover Blvd built?

It was built in 2024, making it 1 years old in 2025.

What condition is US 82/SR 520 (ebl) over N Westover Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does US 82/SR 520 (ebl) over N Westover Blvd carry?

About 9,530 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is US 82/SR 520 (ebl) over N Westover Blvd?

The structure is 126 ft (38.4 m) long with a longest span of 126 ft (38.4 m) and a deck 39 ft wide.

Who owns US 82/SR 520 (ebl) over N Westover Blvd?

It is owned by the State Highway Agency.