US Bridges

Nottingham Way ST over SR 520 ( US 82 Cor Z)

Good

Dougherty County, Georgia · Albany - North West Secti · Structure no. 000000009500530

Built
1980
45 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
286 ft
4 main spans
Daily traffic
17,300
2024 count
Owner
State
State Highway Agency

About this bridge

Nottingham Way ST over SR 520 ( US 82 Cor Z) is a steel continuous stringer/multi-beam or girder carrying Nottingham Way ST over SR 520 ( US 82 Cor Z) in Dougherty County, Georgia. It was built in 1980, so it is 45 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,300 vehicles a day, roughly 1% of them trucks, projected to reach 23,835 by 2032. The structure is 286 ft (87.2 m) long and 68 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNottingham Way ST
CrossesSR 520 ( US 82 Cor Z)
LocationAlbany - North West Secti
RouteCity Street 144
StateGeorgia
Coordinates31.61744, -84.20422
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating25.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length286 ft (87.2 m)
Longest span110 ft (33.5 m)
Deck width68 ft (20.8 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,300 (2024)
Projected traffic23,835 by 2032
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nottingham Way ST over SR 520 ( US 82 Cor Z) built?

It was built in 1980, making it 45 years old in 2025.

What condition is Nottingham Way ST over SR 520 ( US 82 Cor Z) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Nottingham Way ST over SR 520 ( US 82 Cor Z) carry?

About 17,300 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Nottingham Way ST over SR 520 ( US 82 Cor Z)?

The structure is 286 ft (87.2 m) long with a longest span of 110 ft (33.5 m) and a deck 68 ft wide.

Who owns Nottingham Way ST over SR 520 ( US 82 Cor Z)?

It is owned by the State Highway Agency.