US Bridges

SR 91 over Removed CSX Railroad

Good

Dougherty County, Georgia · Albany - Northside · Structure no. 000000009500400

Built
1976
49 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,189 ft
15 main spans
Daily traffic
14,700
2024 count
Owner
State
State Highway Agency

About this bridge

SR 91 over Removed CSX Railroad is a steel continuous stringer/multi-beam or girder carrying SR 91 over Removed CSX Railroad in Dougherty County, Georgia. It was built in 1976, so it is 49 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,700 vehicles a day, roughly 1% of them trucks, projected to reach 26,910 by 2032. The structure is 1,189 ft (362.4 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 91
CrossesRemoved CSX Railroad
LocationAlbany - Northside
RouteState Highway 91
StateGeorgia
Coordinates31.60106, -84.15614
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.9 US tons
Inventory rating35.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans15
Design loadHS 20
Structure length1,189 ft (362.4 m)
Longest span108 ft (32.9 m)
Deck width64 ft (19.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,700 (2024)
Projected traffic26,910 by 2032
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$10.8 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 91 over Removed CSX Railroad built?

It was built in 1976, making it 49 years old in 2025.

What condition is SR 91 over Removed CSX Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 91 over Removed CSX Railroad carry?

About 14,700 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is SR 91 over Removed CSX Railroad?

The structure is 1,189 ft (362.4 m) long with a longest span of 108 ft (32.9 m) and a deck 64 ft wide.

Who owns SR 91 over Removed CSX Railroad?

It is owned by the State Highway Agency.