US Bridges

US 41/ SR7 over Cedar Creek

Good

Crisp County, Georgia · 1.5 Mile South of Cordele · Structure no. 000000008150650

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
90 ft
1 main span
Daily traffic
2,490
2024 count
Owner
State
State Highway Agency

About this bridge

US 41/ SR7 over Cedar Creek is a prestressed concrete stringer/multi-beam or girder carrying US 41/ SR7 over Cedar Creek in Crisp County, Georgia. It was built in 2024, so it is 1 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,490 vehicles a day, roughly 13% of them trucks, projected to reach 5,325 by 2044. The structure is 90 ft (27.4 m) long and 43 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesUS 41/ SR7
CrossesCedar Creek
Location1.5 Mile South of Cordele
RouteU.S. Route 41
StateGeorgia
Coordinates31.93083, -83.7775
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating50.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span90 ft (27.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,490 (2024)
Projected traffic5,325 by 2044
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$12 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 41/ SR7 over Cedar Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is US 41/ SR7 over Cedar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does US 41/ SR7 over Cedar Creek carry?

About 2,490 vehicles per day (2024 count), of which roughly 13% are trucks.

How long is US 41/ SR7 over Cedar Creek?

The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 43 ft wide.

Who owns US 41/ SR7 over Cedar Creek?

It is owned by the State Highway Agency.