I-285 over SR 3 (us 41)

Good

Cobb County, Georgia · 3.1 MI East of Smyrna · Structure no. 000000006700990

Built
1963
62 years old, rebuilt 1986
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
240 ft
4 main spans
Daily traffic
187,000
2024 count
Owner
State
State Highway Agency

About this bridge

I-285 over SR 3 (us 41) is a steel stringer/multi-beam or girder carrying I-285 over SR 3 (us 41) in Cobb County, Georgia. It was built in 1963 and reconstructed in 1986, so it is 62 years old, older than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 187,000 vehicles a day, roughly 1% of them trucks, projected to reach 221,985 by 2032. The structure is 240 ft (73.2 m) long and 149 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-285
CrossesSR 3 (us 41)
Location3.1 MI East of Smyrna
RouteInterstate 285
StateGeorgia
Coordinates33.8844, -84.46994
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating34.9 US tons
Inventory rating20.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length240 ft (73.2 m)
Longest span81 ft (24.7 m)
Deck width149 ft (45.5 m)
Roadway width142 ft (43.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic187,000 (2024)
Projected traffic221,985 by 2032
Trucks1%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3.7 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-285 over SR 3 (us 41) built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1986.

What condition is I-285 over SR 3 (us 41) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I-285 over SR 3 (us 41) carry?

About 187,000 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is I-285 over SR 3 (us 41)?

The structure is 240 ft (73.2 m) long with a longest span of 81 ft (24.7 m) and a deck 149 ft wide.

Who owns I-285 over SR 3 (us 41)?

It is owned by the State Highway Agency.