US Bridges

R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp

Good

Cobb County, Georgia · 6.7 Miles South East of M · Structure no. 000000006753340

Built
2017
8 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
544 ft
4 main spans
Daily traffic
6,805
2024 count
Owner
State
State Highway Agency

About this bridge

R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp is a steel stringer/multi-beam or girder carrying R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp in Cobb County, Georgia. It was built in 2017, so it is 8 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,805 vehicles a day, projected to reach 860 by 2035. The structure is 544 ft (165.8 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesR 7-2SB/ML-I285WBR
CrossesI-285WB/COBB Pky Wy Ramp
Location6.7 Miles South East of M
RouteInterstate 285
StateGeorgia
Coordinates33.88951, -84.46394
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42 US tons
Inventory rating24.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length544 ft (165.8 m)
Longest span160 ft (48.8 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,805 (2024)
Projected traffic860 by 2035
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$57.5 million (2018 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp built?

It was built in 2017, making it 8 years old in 2025.

What condition is R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp carry?

About 6,805 vehicles per day (2024 count).

How long is R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp?

The structure is 544 ft (165.8 m) long with a longest span of 160 ft (48.8 m) and a deck 33 ft wide.

Who owns R 7-2SB/ML-I285WBR over I-285WB/COBB Pky Wy Ramp?

It is owned by the State Highway Agency.