US Bridges

Bob White Trail over I-75 & M9101 FR

Good

Clayton County, Georgia · 0.75 Mi. N. of SR 3 · Structure no. 000000006350430

Built
1996
29 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
388 ft
4 main spans
Daily traffic
4,260
2024 count
Owner
State
State Highway Agency

About this bridge

Bob White Trail over I-75 & M9101 FR is a prestressed concrete stringer/multi-beam or girder carrying Bob White Trail over I-75 & M9101 FR in Clayton County, Georgia. It was built in 1996, so it is 29 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,260 vehicles a day, roughly 1% of them trucks, projected to reach 10,050 by 2032. The structure is 388 ft (118.3 m) long and 44 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesBob White Trail
CrossesI-75 & M9101 FR
Location0.75 Mi. N. of SR 3
RouteCity Street 9077
StateGeorgia
Coordinates33.59235, -84.38572
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating20.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length388 ft (118.3 m)
Longest span128 ft (39 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,260 (2024)
Projected traffic10,050 by 2032
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bob White Trail over I-75 & M9101 FR built?

It was built in 1996, making it 29 years old in 2025.

What condition is Bob White Trail over I-75 & M9101 FR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Bob White Trail over I-75 & M9101 FR carry?

About 4,260 vehicles per day (2024 count), of which roughly 1% are trucks.

How long is Bob White Trail over I-75 & M9101 FR?

The structure is 388 ft (118.3 m) long with a longest span of 128 ft (39 m) and a deck 44 ft wide.

Who owns Bob White Trail over I-75 & M9101 FR?

It is owned by the State Highway Agency.