US19 SR3 Conn. over I-75 (nbl & Sbl)
GoodClayton County, Georgia · JCT I-75 US 19 · Structure no. 000000006350420
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 520 ft
- 2 main spans
- Daily traffic
- 60,200
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
US19 SR3 Conn. over I-75 (nbl & Sbl) is a steel continuous stringer/multi-beam or girder carrying US19 SR3 Conn. over I-75 (nbl & Sbl) in Clayton County, Georgia. It was built in 1996, so it is 29 years old, younger than the Georgia average of 47.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60,200 vehicles a day, roughly 1% of them trucks, projected to reach 74,745 by 2032. The structure is 520 ft (158.5 m) long and 52 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US19 SR3 Conn. over I-75 (nbl & Sbl) built?
It was built in 1996, making it 29 years old in 2025.
What condition is US19 SR3 Conn. over I-75 (nbl & Sbl) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does US19 SR3 Conn. over I-75 (nbl & Sbl) carry?
About 60,200 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is US19 SR3 Conn. over I-75 (nbl & Sbl)?
The structure is 520 ft (158.5 m) long with a longest span of 260 ft (79.2 m) and a deck 52 ft wide.
Who owns US19 SR3 Conn. over I-75 (nbl & Sbl)?
It is owned by the State Highway Agency.