US Bridges

SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv

Good

Clarke County, Georgia · 3.5 MI S of Athens Sq · Structure no. 000000005900820

Built
1987
38 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
839 ft
10 main spans
Daily traffic
55,100
2024 count
Owner
State
State Highway Agency

About this bridge

SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv is a prestressed concrete stringer/multi-beam or girder carrying SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv in Clarke County, Georgia. It was built in 1987, so it is 38 years old, younger than the Georgia average of 47.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55,100 vehicles a day, roughly 8% of them trucks, projected to reach 43,905 by 2031. The structure is 839 ft (255.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR8 SR10L US29 (c
CrossesCR 1423 - Mid. Oconee Rv
Location3.5 MI S of Athens Sq
RouteU.S. Route 29
StateGeorgia
Coordinates33.91582, -83.39394
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71 US tons
Inventory rating26.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20 + Mod
Structure length839 ft (255.7 m)
Longest span96 ft (29.3 m)
Deck width41 ft (12.6 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55,100 (2024)
Projected traffic43,905 by 2031
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv built?

It was built in 1987, making it 38 years old in 2025.

What condition is SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv carry?

About 55,100 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv?

The structure is 839 ft (255.7 m) long with a longest span of 96 ft (29.3 m) and a deck 41 ft wide.

Who owns SR8 SR10L US29 (c over CR 1423 - Mid. Oconee Rv?

It is owned by the State Highway Agency.